
Karachi
Storm Water Drainage Project, KNB, NLC
Overview
The Storm Water Drainage project at KNB, NLC was delivered by TS Builders to strengthen site-wide water management for a high-traffic logistics node. The aim was to ensure reliable runoff control, protect assets, and maintain uninterrupted operations during heavy rainfall.
Civil Construction
Infrastructure Works
Project Description
TS Builders executed engineered drainage works tailored to industrial flow demands, incorporating reinforced channels and controlled gradients for efficient discharge. The system prioritizes capacity, durability, and ease of maintenance, reducing surface water accumulation and improving site resilience. The completed infrastructure delivers dependable performance under peak loads, supporting long-term operational stability at KNB, NLC.
Gallery





