
Karachi
DHA Storm Water Drainage, NLC
Overview
The DHA Storm Water Drainage project for NLC was executed by TS Builders to improve urban water management and mitigate flooding risks within the development area. The project focused on strengthening drainage infrastructure to support long-term environmental resilience and urban functionality.
Civil Construction
Infrastructure Works
Year
2022
Project Description
TS Builders carried out specialized civil and infrastructure works involving the construction and upgrading of storm water drainage channels designed to efficiently manage surface runoff. The system was engineered for high-capacity flow, structural stability, and durability under varying weather conditions. Emphasis was placed on proper gradients, reinforced construction, and low-maintenance operation, ensuring reliable performance and improved flood control for the surrounding DHA area.
Gallery





